....both at the building site and at home!
Early last week we'd asked our builder to compile a list as completely as he could (now that 3/4's of the purchase orders are in from the various suppliers) on how we're doing budget-wise on all of our allowance items.
We need that information to be able to figure out just where we stand so that we can make the one big supplier-related decision still needed at this point in construction: the material to be used for the kitchen cabinets.
Both Robin and I really want granite countertops (we originally wanted some sort of "solid-surface" countertop, but after weighing the pro's and con's -- and prices -- of all the available types and materials {{and there's quite a few we found out!}} we settled on granite), but we aren't about to kill our budget to get that material.
We finally received the last supplier's numbers last night (well, other than lighting and hvac {{heating and a/c}}, who we haven't had our initial meetings with yet, and won't for another 1-2 weeks), and after spending several hours (yeah it was a late night for me.. lol) crunching numbers it was determined that we'll be able to afford the granite countertops rather than the laminate countertops!
Due to all the various Parade discounts given out by about half of the suppliers (about half of them don't offer Parade discounts any more..), the total numbers came out basically the same with the few (but in some cases large) upgrades we requested.
So now that that issue is figured out, we can inform the plumbing supplier of our sink choices in the master bathroom (laminate countertops in there) and the kitchen (granite countertops), as the sinks in both areas can vary depending on the material used for the countertops.
Out at the construction site, alot was happening since last Friday... (we didn't take any photos yesterday as there wasn't alot different that would show up in photos, so I'll combine Monday and Tuesday's photos/progress in this one post)
Almost all the roof trusses are now in place, with the exception of a few of the more specific trusses for things like the front porch and a couple valley trusses. All the large, main trusses are done.
This next photo is over the garage, in the future bonus room area. You can see the attic trusses in place, and they'll eventually put down a plywood subfloor in this area. At the end of construction the bonus room won't be finished, but it will be usable space nonetheless.
Now that the basement floor slab has been poured, Robin and I went down there and nosed around a bit :)
 |
| concrete floor slab with saw cut joints to control the cracking |
|
 |
| stairwell wall framing.. |
|
We were out there taking these photos on Saturday, while the excavator was out there doing most of the "rough grading". ("rough" grading is when the excavator takes the massive piles of dirt, and using Global Positioning Satellite - GPS - equipment does a "rough" job of filling in the grade levels so that the ground slopes to the proper areas for drainage purposes) In the following photo you can see him carefully clearing the dirt that had been piled around the two trees in the front of the house for the last month or so (the smallish pile that was around these trees in the first photo of those post is now gone).
Monday came along and saw more progress on the roof sheathing. The entry canopy has been framed up with the trusses (no front porch roof yet) and the rough grading is basically done.
 |
| Entryway canopy is up |
|
I went around the house and took some photos now that the massive piles of dirt are almost all gone....
 |
| backyard, as seen from the path in the woods. |
|
 |
| The area between the house and the trees on the right will be lawn |
|
 |
| The last of the piles of dirt in the background |
|
The last photo for this update is from the ground in back of the garage looking up at the attic trusses/future bonus room roof framing.
We finally have all the required paperwork in to the bank and they've done almost all their internal work. We're "officially" good to go on our loan to build the house (lol) and should hopefully be closing on the construction loan early next week.
June 4th is the much-anticipated "contractor walk-through" day; almost all the sub contractors/suppliers will be there that day. It'll take most of the day for Robin and I as we walk thru the entire house with each of the suppliers who need our input (i.e. - electrical, pointing out exactly where we want outlets located, etc., etc)
This Memorial day weekend we'll be out at the lot on Saturday. I have a bunch of small scrub trees to clear out along the front edge of the woods, in a plow furrow, so that the excavator can fill in the furrow so that there won't be a pond there (and mosquito haven) every time it rains.
Paul