Sunday, June 10, 2012

Rough-ins abound!

This week has been the week of rough-ins....

Plumbing, electrical, and hvac have been working like crazy all week running piping, wiring, and ducts all throughout the house. In the walls, under the floors, in the ceilings... everywhere.

a main run of electrical wiring in the wall


in-wall ductwork up to the great room

The next photo is looking into the kitchen/dining area.. You can see alot of electrical work has been done and some ducting in the kitchen wall for the microwave's vent fan. The blue boxes scattered all over the place are electrical boxes for outlets, switches, etc. You can also see the can lights in the ceiling above the kitchen area.



Also this week the front door finally was installed. That showed up on Thursday.

from the outside of the house

from the inside of the house
The well driller showed up that same day and began making a massive muddy mess drilling the well...

the well drilling truck
the big muddy mess...
This Monday  they'll be pouring the garage slab and the front porch slab. They're also scheduled to begin putting insulation in the exterior walls.
That will be followed up the next day by them hanging the drywall boards throughout the house.

Paul