Thursday, August 2, 2012

Very busy week!

Whew! This week is almost over! It's been BUSY! (I'm going to be putting the last several days worth of info in one post tonight.. yeah, the week has been that busy.. lol)

Monday came along and the electrician was on-site, putting up the light fixtures. We dropped them off at the site Sunday night so he could start right away. When we got there Monday evening they were all up (not all of them had light bulbs in them yet tho).

living room

Rachel's room

Lyndsey's vanity

Lyndsey's room

Rachel's vanity

tv mounting bracket in the living room

kitchen

half-bathroom

dining room

entry foyer

den

That same day the carpenter was working the stairs and some other details.....

wood shelf in the nooks

half-walls in the living room

pantry door
Tuesday had the carpenter back and hard at it again....

living room half-wall columns

loft overlook onto the entry foyer

overlook into living room

Lyndsey's window seat

Rachel's window seat

stairway to basement

looking at the kitchen from the living room

Joe had put up scaffolding so that the decorator (Debbie) could put up some of the decor for the Parade that is up higher....






The landscaper was out and dug the trenches for me to lay the drain pipes that will take the water from some of the front downspouts out to the ditch so it's not running across the lawn all the time..


...so I was out there until it got dark, laying about 140 feet of drain pipe so that when the landscaper showed up on Wednesday he could backfill the trenches and install the lawn.




While the landscape crew was working all day outside, the flooring installers began installing the carpeting.











Also outside, the gutters were finally being installed as well. They were supposed to hit the 3 drain pipes I'd laid with three downspouts...... unfortunately, they didn't do this. So they're going to have to come back out to redo one of them and the builder will fix the other two.


While all of that was going on on Wednesday, I'd taken the day off to also be at the site doing landscaping too. I had mulch to move, dirt to level, landscape edging to install, and a few areas in the back yard to put down grass seed and fertilizer.

Today (Thursday) the flooring installers were hard at work finishing up all the carpeting installations.....

the den

stairway

master bedroom


living room

Rachel's room


the loft

Lyndsey's room

basement stairway

Pretty much the only thing that is scheduled to go on tomorrow is that the rest of the appliances will be arriving later in the day.
Robin and I have alot to do over the weekend in preparation for the Parade the following weekend. We have mirrors to hang, things to plant outside, I have to finish spreading the mulch/wood chips pile in the back yard, and several other things.
The cleaners will show up and clean the house from top to bottom on Saturday and Sunday.

Then on Monday, the painters come back thru and do any last touch up work, the carpenter still has a couple details to finish up, and the inspector will come thru to do a final inspection of the house.

In the mean time, I'm hoping it keeps raining more often now that our lawn is installed and craving water.. otherwise I'm out there twice a day moving sprinklers! lol!

Paul

Sunday, July 22, 2012

The a/c is on...!

This past week has been somewhat quiet, save for a few pretty substantial advancements... (many of the subcontractors were working on other projects during some or most of the days... thus there's not as many photos this time around and only the one update since last Sunday)

Tuesday saw the most significant item when the granite countertops arrived in the kitchen.





The cabinet suppliers were back on Wednesday and installed some of the remaining few cabinets that weren't in yet and added all the door and drawer hardware to the cabinets too. Also, the first appliance showed up and was put into place;  the dishwasher was the first one installed (by the plumber).

in the kitchen

our dishwasher is here!

the master bathroom tower

tower again...
the laundry room cabinet hardware

the laundry room


Also this past week the replacement countertops showed up for the girls' vanities....



Just to see what it'll look like, we set one of the sinks into the countertop in the master bathroom.


It was getting dark out, so I thought I'd light up the outside and see what it looked like, since the electrician has been at the site on and off this week getting more and more items finalized.


The electrician in on vacation next week, so next weekend we'll be delivering all the light fixtures to the site so he can install them the following week.
The plumbing and hvac sub contractors have been busy this week.. with the hvac work looking like it's nearly completed. The air conditioning is now working at the new house, a fact which I'm thinking will make the guys working in there happy next week.. lol

Ken Stencil is scheduled to arrive Monday to pour the driveway and the sidewalk, so Robin and I laid out the path of the sidewalk using a garden hose to mark it.

The finish carpenter has begun working on the stairs.... we'll have some photos of that this week.

The painter is schedule to be on-site this week as well, to do all the finishing touch up work he has to do.

The gutter and downspout installer should be there this week too, as should the excavator to complete his grading work after the driveway is poured.
I know the lawn installer will be itching to get out there this week too.

We're still on schedule for our final inspection date of August 6, with the carpeting scheduled to go in August 3rd, the same day the rest of the appliances are scheduled to arrive.

By the end of next week the house should be really close to being completed!

Paul