Sorry everyone.. it's been a bit longer than I wanted since I wrote last... so I'm going to put a few days into one post ;)
Friday saw the framers get the plywood subfloor installed on top of the floor joists that were in place already. Dennis (the builder) tells me the subfloor plywood is designed to be able to sit submerged underwater for 30 days before the water begins to ruin it. Good thing too, since we've gotten alot of rain around here since it's been installed! lol
The square area in the middle with the wooden "handrail" around it is the opening that will eventually be the stairways to the basement and to the upstairs.
In the garage-to-basement stairway opening (shown in the last photo above) there was a ladder, so I took a few shots down in the basement.
You can see the steel posts that are supporting the pre-lam wood beams that hold up the flooring system. At the bottom of each post is a small concrete footing poured in the gravel bottom. You can also see a basic stud wall system in place below the stair opening from the first floor. Those will eventually be the walls on both sides of the stairway.
 |
| Looking up at the stair opening |
|
After a wet and rainy weekend (and now a couple of inches or water on the gravel in the basement) Monday saw new progress: Walls!
About 3/4's of the first floor exterior walls are now framed up! You can also see the plywood sheathing on the outside of alot of the framed walls already in place. Insulation will eventually go inside the studs of the walls and the siding will be installed on the outside of the sheathing.
The 2"x6" exterior studs are spaced at 24" on-center. The framed openings that don't go all the way down to the floor level are window openings, while any framed openings that do go all the way down are door openings.
 |
| Doorway from the garage to the house |
|
 |
| Window about kitchen sink, and patio doorway |
|
 |
| Unframed corner of the living room. All 1 1/2 story walls here |
|
 |
| Master bedroom / bathroom walls |
|
 |
| Den wall and the stair opening |
|
Tuesday brought even more progress! Not only are most of the exterior walls now framed up, but about half of the interior walls as well!
The next photo has me standing near the doorway between the garage and the house (it's just to my right) and Rachel is standing in front of the den window. The photo after that swings around a bit to show the "back hallway" and the kitchen area (window and patio doors).
 |
| see the framed up, but not installed, wall segments laying on the floor? |
|
The next two photos show that they've begun to put up the 1 1/2 story walls in the living room...
Here we see the master bedroom/bathroom framing. I'm guessing they'll leave this area for last until after they get the living room tall walls framed up.
...and next up are some people acting goofy for the camera.. ;)
 |
| Lyndsey posing in the front entryway |
 |
| Rachel checking out the half-bathroom |
|
 |
| ...and... well.....yeah, I got nuthin'.... |
|
The rains came to the area mid to late afternoon today, but the next couple of days say clear skies so it should be interesting to see how far they can get by the end of the week.
Also today, we had our first private showing (totally unannounced and thus, a complete surprise to us) of our house since it went back up on the market. It just so happens it's a guy who Robin used to work with. We should get a "showing report" from our realtor tomorrow on what they said about our house after going thru it.
Tomorrow night we have our first meeting with the electrician. We'll be going over stuff like quantities of the recessed "can" lights he'll be installing, etc.
Paul