Wow! Was that hectic! (and kinda fun!)
Monday was our on-site contractor walk-through. Most of the contractors associated with our house to this stage were there.
Plumbing, electrical, hvac, well-driller, Dennis, etc. Each of them came to the meeting armed with their bid, alot of questions for Robin and myself, and suggestions/ideas for some of their stuff.
We started off with the plumbing installer. He needed to know things like how high the shower heads needed to be mounted, where the washing machine would be sitting exactly, where we wanted the outdoor hose faucets, etc. As we were walking around the outside of the house making those decisions, the well-driller caught me and wanted to know where the well head should be placed. He had a spot all picked out, but the plumbing installer brought up some good points and we moved it a bit and we were then told the well should be drilled on Thursday of this week.
| plumbing drain and vent piping in half-bath |
| kitchen sink drain and vent piping |
| master bathroom sinks drain and vent piping |
After the plumbing, we talked with the hvac (heating/ventilation/air-conditioning) installer. We talked about two different types of furnaces (we're getting one that's 95% efficient), various options for control panels/thermostats, etc., etc. We also had to decide where we wanted the air conditioner to be placed outside (we picked a nice spot that's completely hidden from most every side of the house.
Once hvac was done with us we hit up the electrical installer. With him we had to figure out exactly where we wanted things like "can" lights...
| can light rough in in the kitchen |
.. and some things he didn't know about like the master bathroom lights won't be your typical above-mirror fixture, we're having pendants instead. Likewise, we had in the bid 3 pendant lights over the snack counter in the kitchen, but after looking at how it lays out in the actual kitchen we were able to reduce that number to only 2.
We have a few of those little lights in the side walls of the staircases (rather than having a light fixture mounted on a wall, etc). Here's the rough-in of one of those.
..and an exhaust fan in a bathroom....
After we were done with all the sub-contractor walk-throughs we had some things to discuss with the builder as well. In conversations with him some things were mentioned that sparked ideas from us or Dennis and also little details that can only be flushed out during construction.
We got to look around at a bit more leisurely pace after that. The framing of the fireplace enclosure continues...
Monday was a very busy day for Robin and myself... but Tuesday brought a very big task for the two of us of another sort....We had a meeting at the bank to finally close on our construction loan.
After a 30 minute meeting and the handing over of a sum of money to the title company for closing costs, etc., we were on our way.
We stopped out at the new house after that and took some more photos.
Today the girls' bathtub got installed. They've been waiting to see that since it showed up on site last week.
Downstairs, the living room half-walls and fireplace "black box" were installed today.
In the master bedroom, framing was started on our tray ceiling in there, as well as a surprise to Robin that Dennis and I had worked out... a smaller tray ceiling above her reading nook.(yeah, Robin loved it) They're kind of difficult to make out in amongst all the other framing...
The plumbing installer had been doing alot more of his rough-in stuff too... you'll notice the red or blue "PEX" piping; the red is hot water runs, the blue is cold water runs.
| hot and cold water piping in the hallway wall framing |
| half-bath hot and cold water piping for the sink |
| master bathroom shower head piping |
The framers were busy again today (as they are every day).
| half wall at the stairs from garage to basement |
| doorway framing at bottom of stairway from foyer |
| doorway framing at bottom of garage stairway |
The electrician was also very busy today, installing more rough-ins for outlets, switches, and light fixtures throughout the house.
The following two photos are of can lights on the exterior soffits of the house (front of the house).
| above the master bedroom window |
| above the reading nook window |
The word from Joe (Dennis' on-site construction manager) is that they'll have the rough in stage done this week and they'll begin insulating the walls early next week, followed immediately by hanging the drywall around the interior of the house. That'll certainly change the look of the interior substantially.
This week I'll be helping our neighbor pull wiring through the house for the security system we're going to install (he owns a security installation company that's done very well for itself), and then this weekend I believe I'll have to do a bit of insulation work in one of the walls in the house as well.
Also, I'm getting bids in on the seeding of the lawn, and the pouring of the concrete driveway slab too.
Robin and I also need to get out and finalize our light fixture selections some time in the next week or so.
In today's news of our current home, the buyers had their inspector come through the house. We should be getting his report back in a few days. The previous buyers' inspector gave us mostly high marks on things and only a few "not quite as high" marks on a couple things just attributed to the age of things in the home.
Paul