It's time for interior paint...!
Our early Monday morning meeting with the painter was very informative, both for the painter, and Robin and I.
There were some.... incorrect ideas between us, the builder's on-site guy, and the painter on how exactly the painter goes about his business.
Rather than him just spraying each room one color (ceiling color), he actually sprays the whole room the ceiling color and then comes back and sprays the walls the wall color of choice, with only a small-ish area of overspray of the wall color on to the ceiling.
Due to the covering ability of the paint he's using, touching up the overspray on the (lighter colored) ceiling isn't a big problem at all.
So we've gone from having to paint the entire wall surfaces in three rooms to just having to do touch up/cut in work on the ceilings.
Anyway, the painter was able to do all of this in one day.... and here's the results (you'll notice the overspray areas on the ceilings...):
| the garage color.. "sawdust" |
| the tray ceiling in the master bedroom |
| the master bedroom |
| Rachel's room |
| Lyndsey's room |
| the living room "nooks" above the fireplace |
| the office |
| the kitchen/dining area |
| the living room |
| the laundry room |
| stairway to the basement |
| master bathroom |
| entry foyer overlook |
In those photos above you'll see there's still plastic covering all the windows. That makes the colors look a bit "off" from what they really are. It's pretty cool to see all the color added to the interior now though!
While the painting was going on, the siding guy was outside working on the siding some more.
During the day on Monday I found out that the hvac guy was there measuring up for the ductwork, the plumber was there a bit, and the mason (stone) was there discussing the front of the house with the siding guy.
Tuesday came around and after the meet-up between the siding guy and the stone mason guy, they siding guy started working on the front of the house in anticipation of the stone arriving on site for a probably Thursday start to stone installation!
You can see the siding on the front of the house only comes down to the bottom edge of the windows. That's because the stone we selected will be installed from that line to the bottom of the front wall
While I was out there today, I wound up fielding a call about the excavator. It sounds like he's getting ready to come back to do the finish grading.
I also wound up fielding several questions from the plumbing contractor, and Dion the septic system installer was out there today as well. We spent some time marking off the proposed location of the septic (mound) system, only to find that as preliminarily designed (6 feet wide by 90 feet long) it would wipe out too many mature trees. So we marked off a shorter and wider (roughly 7 feet wide by 70 feet long) mound system design that'll minimize the number of trees (1 mostly dead one) that'll have to get cut down. (that'll be this weekend I'll go out there to do that) He'll submit the redesign to the County and he should be able to install the mound system next week he's hoping.
The plumber was out there today too. He ran/finished up running all the white pvc drain piping throughout the house. He said tomorrow he'll be back and run the bulk of the hot and cold water piping.
There was a large-ish purchase order submitted through Robin's office by the electrical contractor for all the switches, outlets, and faceplates with a delivery of tomorrow. So it would seem he'll also be out there tomorrow working on those.
Tomorrow should see the siding guy finish up in the front of the house. They'll also be building the "step" that'll go underneath the washer/dryer tomorrow too.
Thursday is scheduled to see not only the stone mason begin work on the stone (that same stone is also facing up the front of the fireplace too), but the flooring supplier will begin installing the hard (non-carpeting) floors that day as well. (I'm told the hard flooring install will take through Tuesday of next week to complete)
Paul